Toblerone

16"W x 16"L x 96"H

3/16" frosted acrylic

Bridge

Installation now on view
Cooper Union EYOS
Opening May 23, 2011

8'W x 30'L x 5.5'H

3/4" birch plywood, screws, latex paint

This is a site specific installation for the 3rd floor lobby of the Cooper Union Foundation building. Using the idea of a stone compression bridge, this project expresses the idea of "keystones" using hollow plywood boxes.

Curved in plan and elevation, the bridge bends around existing structural columns of the site, highlighting the path between two elevator shafts.

Foamcore model. 1:12 Scale.

Star Knot

48"W x 40"L x 36"H

1/4" knotty pine plywood, solid pine endgrain, maple

Toylight

1.5"W x 3"L x 1.5"H (one module)

1/8" translucent acrylic, magnets, LEDs